The permit rules are the same
A council doesn't care whether your shed came in a kit or was designed from scratch. Both are Class 10a buildings, and both follow the same rules. The state has said there are no special exemptions for prefabricated or kit buildings, and warns that "permit-free" claims can be misleading.
A shed usually needs no building permit only if it's freestanding, 10 m² or less, no more than 2.4 m high, and not in wind region C or D. Anything bigger needs a permit, kit or not.
Who does what
| Kit shed | Custom shed | |
|---|---|---|
| Structural engineering | May be supplied by the kit maker for your wind rating | Your builder or designer arranges it |
| Site plan | Usually yours to provide | Usually drawn by the builder or a drafter |
| Floor plan and elevations | May be included in the kit paperwork | Drawn to suit the design |
| Lodging the application | Usually you, unless the supplier offers it | Often the builder, but check your contract |
| Who builds it | You, or an installer | The builder |
Kit suppliers vary. Some say they handle the forms, drawings and engineering; others only send drawings. Ask in writing what's included before you buy.
What councils ask for
The Shire of Serpentine-Jarrahdale's list is typical:
- A BA1 or BA2 form, with all owners named
- A site plan at 1:200 showing setbacks, shed size, soak wells or tanks, easements and any septic system
- A floor plan and elevations at 1:100
- Engineering signed by a structural engineer, covering footings, slab and tie-downs
The Town of Mosman Park says every shed needing a permit must be certified by a structural engineer, whichever form you use. Serpentine-Jarrahdale also says a second-hand shed needs a recent engineer's sign-off for the new site, and a shed within 6 m of a house in a bushfire-prone area may need a BAL assessment.
Do I need a registered builder?
From 1 July 2026, a Class 10a building such as a shed or garage under $50,000 doesn't need a registered builder, and an owner can build it without owner-builder approval. Over $50,000, the state says a prefab or kit building that needs a permit must be put up by a registered builder or an approved owner-builder.
Not sure what the site plan needs? See how to draw a shed site plan, check your size with the shed size checker, or read how to get a shed permit.