What a site plan is
A site plan is a bird's-eye drawing of your whole block. It shows where the shed will go in relation to the boundaries and everything else on the lot. Councils use it to check setbacks and fire separation, and that the shed avoids pipes and easements. It's needed for most shed building permits, especially uncertified (BA2) applications.
What councils ask to see
Requirements vary a little, but these Perth councils' checklists overlap a lot:
- All lot boundaries with their dimensions (City of Swan)
- The new shed, with its distance to every boundary (Swan, Wanneroo, Belmont)
- All existing buildings and structures, with distances to the shed (Swan says all existing structures must be shown)
- Ground levels: contour survey or spot levels, and the proposed finished floor level (Wanneroo, Belmont)
- Easements (Belmont)
- Septic systems, if you have one (Wanneroo)
- A north point (Wanneroo)
Scale
Draw it to scale, usually 1:200 for a house block. The City of Swan suggests 1:200 for residential site plans and 1:100 for floor plans and elevations. Belmont and Wanneroo say a minimum of 1:200.
Step by step
- Get your lot shape. Your certificate of title or a Landgate plan shows the boundary lengths.
- Get your existing house plans. Councils such as Stirling will supply copies of plans on record to the owner, which saves measuring.
- Find pipes and easements. Get free plans from Before You Dig Australia (or call 1100) and check your title. See building a shed near a sewer.
- Measure and mark the shed. Show its size and the distance from each wall to the nearest boundary and building.
- Add levels if the block slopes. On sloping blocks, councils may ask for a feature survey by a licensed surveyor.
- Label everything. Address, lot number, north point, scale and your name. Number all pages (Swan asks for "1 of 4" style numbering).
What else goes with it
The site plan is one part of the package. Swan's checklist for Class 10 structures like sheds also lists working drawings (floor plan, elevations, cross section), structural engineer's certification, a termite management plan and, if the shed doesn't meet the R-Codes, a variation request with neighbours' comments.
Check the setbacks your shed needs with how close a shed can be to the fence, and see the full shed permit process.