Do you need a building permit?
Usually yes. The City of Armadale says a shed or garage doesn't need a permit only if it is all of these:
- less than 10 m² in floor area,
- freestanding, and
- no higher than 2.4 m.
Even a permit-free shed must meet the building code, including fire separation from boundaries and other buildings (for example, at least 900 mm). Check yours with the shed size checker.
Where it can go
Sheds aren't allowed in the front setback area, which is the front yard forward of the house line. Other setbacks follow the City's local planning policies and the R-Codes. Planning approval may be needed before a building permit can be issued. See how close a shed can be to the fence.
Who can build it
The City's June 2026 sheet says a registered builder or owner-builder approval is needed if the build cost is $50,000 or more.
How long it takes
| Application | Who checks it | City's time limit |
|---|---|---|
| Certified (BA1) | A private building surveyor signs a certificate first | Up to 10 business days |
| Uncertified (BA2) | The City's building surveyor | Up to 25 business days |
The permit lasts 2 years. When the shed is finished, the builder lodges a BA7 notice of completion within 7 days.
What to send
- A BA1 or BA2 form, signed by the builder and the applicant, and the fees.
- A site plan at 1:200 showing the shed, existing buildings, boundary setbacks, fire separation and any septic tanks or leach drains.
- A floor plan, elevations and cross-section at 1:100.
- A structural engineer's certificate.
- A bushfire (BAL) assessment and planning approval, if needed.
- A Construction Training Fund levy receipt if the work is over $100,000.
See shed site plans. Call the City on 9394 5000.