When you need a building permit
In Melville, a freestanding shed needs a building permit if any of these apply:
- The floor area is more than 10 m²
- It is more than 2.4 m high
- It's in wind region C or D
The City says a freestanding shed can go right up to the boundary, but must be at least 900 mm from a house wall or 450 mm from the house eaves to meet the building code's fire rules. If that can't be done, the shed must be 900 mm from the boundary.
When you need planning approval
In a residential zone, planning approval is usually not needed if the shed:
- Isn't attached to the house, and isn't lived in
- Together with other sheds is no more than 60 m² or 10% of the site, whichever is less
- Has walls no higher than 2.4 m and a ridge no higher than 4.2 m
- Isn't in the front or side street setback (6 m at R15 to R25; usually 3 m to a side street)
- Is 1 m from side and rear boundaries (closer may be allowed, so ask the City)
- Keeps enough open space (50% at R15 to R25, 45% at R30 to R40, 55% at R12.5)
- Isn't on a heritage-listed property
In other zones, planning approval is always needed.
Fees and timeframes
| Item | Melville's figure |
|---|---|
| Building permit, shed under $20,000 | $166.65 |
| Building permit, over $20,000 | 0.19% plus 0.137% levy |
| Verge bond, work over $20,000 | $1,900 plus $100 inspection fee |
| Planning approval, under $50,000 | $147 |
| Written planning advice | $73 |
| BA1 / BA2 decision | 10 / 25 working days |
| Planning decision | 60 days, or 90 with consultation |
Check your shed with the shed size checker, or read garden shed approval and how close a shed can be to the fence.